Sample Thesis Topic

Thesis topic is difficult to decide that’s why students and research consult their adviser for the recommendation.  Make sure that your thesis topic is feasible in such a way that there is enough information available.  Also, don’t forget to look if your thesis topic has literature in a way that there is relevant data.

The last but not the least, you should be knowledgeable in your topic thesis.  It is not necessary if your topic is popular as long as you are interested and fascinated in your thesis topic. In addition, it is important that your thesis topic is in your field of specialization.  Think an issue that you want to study and turn into question so that you will finally decided your thesis topic. If your topic is too broad, you should make it specific.

Below are some examples of thesis topic: Some are too broad, limit it into more specific to avoid vague topic and to limit the scope of your thesis statement.

•    Electronic Voting

•    Pros and Cons of Reverse Telephone Look Up Service

•    Formal and Informal Education

•    Advantages of K12 Education System

•    Chest X-ray Requirement for Grade School Students as part of School Admission

•    Causes of Diabetes in Children Today

•    Relationship Between Obesity and Diabetes in Children

•    Effects of Global Warming

•    Public Versus Private School

•    Normal and Caesarian Delivery among Women

Thesis Statement Writing

Statement of purpose is written and eventually you will determine the thesis statement and done some research. You will state your thesis statement in your introduction and prove your thesis statement with facts in the body of your paper and finally repeat it along with a summary and in your conclusion.

Thesis statement is written to prove with evidence.  It should be a product of your serious thinking after having some research.  The thesis statement will be the main focus of your total project.  It should be the main idea of your paper. Make sure that you have enough research to have a strong argument.

You will never have a thesis without a thesis statement which will tell the reader the importance of the subject matter or main idea and exactly inform the reader what to expect to the rest of the paper.  Thesis statement is usually a single sentence that presents an argument to the reader.

To formulate a thesis statement, you should have a problem and then think of a possible argument.  After you have an argument, you can now start to search for the sources of information to make sure that you will have enough evidence for your thesis statement.

Choosing a Research Paper Topics

Choosing a research topic is one of the hardest parts of developing a research.  But once you have a selected topic that is interested to you, it is now ready for the next step. It is important to choose a topic that really enjoy with you.

Select a topic that you have a personal interest and have a knowledge as well as you have desire to learn more of the selected topic. Your selected research topic should not be too broad.  Make sure to narrow your topic and interesting.

In choosing a research topic, make sure that there are available sources of information such as books, magazines, journal entries, and articles that you may use to your research.  You may also try to searching in your favorite search engine to know if the topic selected in available online. Always take a few steps before proceeding and finalizing the topic selected to ensure that it can be easy to research and has sufficient information over days and weeks to come because you don’t want to invest so much time in a project.

There are a wide range of different topics you can select according to the requirement of your school.  Examples of these topics are categorize as business, education, drugs and drug abuse, environment, family issues, health information, medical issues, religion, social issues, psychology, science, media and communication and many more.

Some Thesis Writing Tips

In order to write a thesis, it entails a lot of perseverance, discipline and determination.  You should set a date when to start your research and when to stop doing a research. Having a timetable will help you focus on some task that will add value to your thesis.

The ideal completion deadline for your thesis is at least three months after your start date.  Also, it is necessary to have a deadline for each chapter for instance two weeks for each chapter.  You should already have an idea what will be the content and title of each chapter. You can break your writing task into small sections. Aim to have 500 words everyday.  You can beat and achieve your target everyday and soon adds up.  Always plan your progress and keep track of your activities through calendar.

You should have a comfortable environment free from distraction.  You can work on home since it may have few distraction than in your office.  You can write early in the day as possible. During the night, prepare your next goal for the next day. You can also change your working environment because sometimes working for the same place for so long can make yourself too comfortable.  You can try to the café or library where there are others who are working.

Take a break for sometime while working. You can drink a cup of tea and stretch your legs.  Always be nice to yourself, eat and sleep well and socialize.

Research Paper Outline

Research paper has four main parts such as introduction, methodology, body and conclusion. Headings and subheadings are denoted by Roman numerals and capital letters respectively.

Introduction is the first heading in an outline for a research paper.  This contains the details and basic information in the research paper.  It should highlight the different areas of the research paper or thesis. It also defines the rationale behind the work.  It also includes the background, importance, limitations as well as assumptions. In addition, introduction should connect the methodology to the framework used to solve the problem.

Methodology has the information on how the research is conducted.  It also describes the analysis and methods used to achieve the results in the research paper.  It explains the way the thesis or research was analyzed as well as the sources of information.

The body of the research paper contains the explanation of all the ideas.  It presents all the arguments to support the thesis statement.  All arguments should be included and the strongest arguments should be the final point.

The last part of your research paper is the conclusion.  It includes the summary of all covered in the research paper such as all the arguments.

Conclusion and Recommendation for Pico Hydro Project

6.1    Conclusion

Pico hydro power generation is renewable energy resources build for simple operation, robust, reliable, efficient, low cost and low maintenance.

According to the results taken from our analysis, run off river in Sitio Catmon has the potential possibility to produce desire amount of electrical energy and is recommended for a pico hydro installation.  The available head and flow are quite more than enough to provide energy needs of the two consumers.  Although the river is being used for irrigation, there are decreasing occurrences of crop failures of the field due to its intensive irrigation schemes to sustain the availability of water.  It would also be possible to utilize the entire 35 1/s flow and more since it is run of river scheme in which all water will be returned to the stream and it taken during dry season.

Also, implementation of this kind of renewable energy project would be helpful to the community of Maluya  There is an opportunity for the pico hydro project to offer battery charging which could help the local community in addition to providing a small revenue steam to help pay routine maintenance of the system.  Based on the survey it seems likely that a battery financing and charging scheme could be developed the annual energy cost for off grid households.  Further surveying would need to be done to determine the exact details of the battery financing and the most appropriate rate for battery charging.

6.2    Recommendation

Before embarking on any hydro power generation project, it is essential to survey the proposed site to calculate the amount of available hydro power.  The two vital factors to consider are the flow and the head of stream or river.  The larger the flow – i.e. the more water there is, and the higher the head – i.e. the higher the distance the waterfalls the more energy is available for conversion of electricity.  Double the flow and double the power double the head the power gain.

Water turbines are generally considered as clean power producer, as the turbine causes essentially no change to the water.  They used as renewable energy source and are designed to operate for decades.  Constant maintenance and repair works will be required in this system otherwise the life of the generating equipment will be considerably reduced.  Powerhouse maintenance should be done to achieve the longer life of the turbine and other generating equipments.  The greasing of bearings should be done at least twice a month or whenever necessary because it will optimize the spin of the turbine.  The two bearings are lubricated every 3 months and lower bearing seal replaced every 6 months of continues used.

The flow of water in the river should be enough throughout a year, extreme flows can affect to the system performance and the excess flow must be controlled.  For measurement of the flow it should at least be done twice a year during the lowest season (February – May) and also in the highest season (end of September – beginning of October).  Since the installation of pico hydro power house is along the river trained technicians are required to ensure long term availability of the pico hydro and to check and controlled the excess flow of rate.

Maintenance of pico hydro is just easy and simple.  It can be done without the need for special tools.  The unit has an expected life span of 4-5 years which can be extended with regular maintenance and used of high quality bearings.
Excerpt from the Project Study for Rural Electrification by Jerome dela Cruz, Kenneth Aquino, Wilgem Regino Crespo, John Andrew Molino and Rosauro Fernando Jr of BPSU.

Sample Methodology for Pico Hydro

This chapter refers to the theoretical analysis of the method appropriate to a pico hydro field of study or to the body of methods and principle particular to a branch of knowledge.

It is nothing more than a simple set of methods or procedure, or it may refer to the rationale and the philosophical assumption that underlie a particular study relative to the scientific method.  Specifically, this chapter includes the Gantt chart, flow chart and the scope of work of the project study.

4.1 Gantt chart

4.1.1 Pico hydro system planning

This stage is the most critical stage in this project as it determines the feasibility and achievement of water available from the water flow inside the penstock, used turbine and generator type and capacity, capacity of electrical load to be supplied by the pico hydro system and the cost of developing the project and operating the system.

4.1.2  Site Selection

There are thousands of sites where people have a source of falling but do not have electricity.  For these rural communities, pico hydro is the lowest cost technology for generating electricity.  Lighting from this source is cheaper than using kerosene lamps, and safer too.  There are three basic types of location which are suitable for conducting a study regarding the energy potential of available in Maluya Central, Balanga City, Bataan is suitable for the implantation of the study regarding the generation of electrical energy.

Pico hydro power generate a limited power, because of that, is oriented to reduced application as small grid or individual use.  According to this, to avoid high grid expenses and power losses, the site should not be too far from end users.  As a standard for 1 kw of power, the distance should not be more than 2km in this project, the distance if the site into the end user is 150m obtaining 240W which is appropriate for the study.

4.1.3    Measuring Flow

The flow of water in a river should be enough throughout a year, extreme flows can affect to the system performance, and the excess flow must be controlled.  The measurement of the flow should be at least be done twice a year, during the lowest season (February- May) ad also in the highest season (end of September – beginning of October.

The flow of water on the desired locations was determined using practical methods.  The water flow can be located approximately by knowing the water speed.  By dropping a left upstream and reading the time it takes to travel the measured distance.  This practical approach of measuring the speed of water is done exactly 15 times.

4.1.4    Testing and set up

This includes set up and of pico hydro to chosen site in sitio catmon, diwa, pilar, bataan.  Pico hydro set up typically are run of stream, meaning that dams are not used , but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before being exhausted back to the stream.

The two vital factors to consider are the flow and the head of the stream or river.  The flow is the volume of water which can be captured and redirected to run the turbine generator, and the head is the distance the water will fall its way to the generator.

4.2    Flow chart

A flow chart shows the step by step process represent in boxes of various kinds, and their order by connecting these with arrows, this diagrammatic representation can give a step by step solution to a given problem.  The process is stared with the selection of topic data, data gathering and data analysis, site investigation, canvassing of materials for the design, fabrication, measurement and calculation of the parameters present at the site, testing of the system and troubleshooting.  But if there is a point in a process wherein an error takes place, it is necessary to go back to troubleshooting, design and calculation of parameters.

4.3    Input parameters

Flow rate – amount of water that flows that passes the turbine in a given time, measure in the liter/second.

Head – the height of water surface flowing into the turbine down to the water surface below, measure in m(m), inches (in), of feet (ft)

Hydraulic pressure – relationship between the force you apply and the result you get.  It is the way a liquid acts in a closed system of pipes and cylinder.  The action of liquid under such condition is somewhat different from its behavior in open container or in lakes, rivers, or ocean.  You cannot compress most liquid into a smaller space.  Liquid don’t give the way air when you apply pressure, nor do liquids expand when you removed pressure.

4.4    Output parameters

Electric power – amount of work done by an electric current in a unit time.  It is considered a rate at which electrical energy is transferred by an electric circuit.  The SI unit of power is the watt.  When electric current flows in a circuit, it can transfer energy to do mechanical or thermodynamic work.  Devices convert electrical energy into many useful forms such as heat (electric heater), light (light bulbs), motion (electrical motors) and sound (loudspeaker).

Power house – the rate at which electrical energy is transferred by a circuit.  In physics, it is the rate at which work is performed or energy is converted.

Voltage – it is commonly used as a short name for electrical potential difference.  The voltage between two points is a short name for the electrical driving force that could determine an electric current between those points.  Basically, it is equal to energy per unit charge.

Electric potential energy – potential energy can be defined as the capacity for doing work arises from position or configuration.  In the electrical case, a charge will exert a force on any other charge and potential energy arises from any collection of charges.  It is also a potential energy associated with the conservative coulomb forces within a defined system of point charges.

Ampere – in practical terms, it is a measure of the amount of electric charge passing a point per unit time.  Around 6.24 x 10 to the 18 electrons or coulomb passing a given point each second constitutes one ampere.

4.5    Water source and energy potential

A run of river has been chosen for the pico hydro system due to the fact that it has a high head, suitable flow rate, and is conveniently located near the main.  Although the stream is being used for irrigation, there are decreasing occurrences of drop failure due to having intensive irrigation schemes for the execution of the supply of water.

All measurements were taken during the dry season (late January).  Using the float method, the flow of the river was determined to be around 0..35 m3 (351/s).  Effectively, this is the amount of water not currently being used by the community.  Practically, it would be possible to utilize the entire 35 1/s flow since it is a run of river scheme in which all water will be returned to the stream.

The available head and flow is enough to provide for the energy needs of one household.  As such, there is range of possibilities for the combination of head and flows that would be sufficient for the system.  The final decision was determined based on the most convenient location for civil works and the power source.

A proposed location for the intake was along the river.  This provides a gross head of 1m between the penstock intake and the powerhouse based on the requirement of the turbine, a flow rate of between 12 and 15 liters/s will be used (approximately 45% of the low season flow).  This will ensure the required flow is available year round, in addition to preserving the aesthetic quality of the waterfall.

4.6    Civil works

Since the stream has more than flow to power the system even during the dry season, only a low level of civil works will be required.  A small collection area was submerged.  Although there is limited amount of sediment in the stream, the collection area will also allow any sediment to settle before entering the intake.  To further ensure the intake is submerged during the dry season, a small diversion could be constructed on the shelf using stone and mortar.

4.7    Transmission lines

The household is located 100 meter from the proposed power source, which will be required 50 meters of transmission cable 3.5 mm2 cooper wire THWN/THHN service drop wire was in connecting transmission and is locally available and suitable for a 118W system.

Excerpt from the Project Study for Rural Electrification by Jerome dela Cruz, Kenneth Aquino, Wilgem Regino Crespo, John Andrew Molino and Rosauro Fernando Jr of BPSU.

Sample Theoretical Framework for Pico Hydro

Theoretical Framework

A theoretical framework is a collection of interrelated concepts, like a theory but not necessarily so well worked out, guide for your research, determining what things you will measure, and what statistical relationship you will look for.  It covers the experimental and mathematical method for calculation purposes of the main electrical equipment which the project is going to used.  That main equipment is the generator, hydro power and pico hydro.  Here, also discussed the theory, parts, function, and principle from basic to complete one.

3.1 Pico hydro system

Renewable energy is energy which comes from natural resources such as sunlight, wind, rain, tides and geothermal heat, which are renewable (naturally replenished).  In 2008, about 19% of global final energy consumption came from renewable, with 13%  coming from traditional biomass, which is mainly used for heating and 3.2% from hydroelectricity.  New renewable (small hydro, modern biomass, wind, solar, geothermal, and bio fuel) accounted for another 2.7% and are growing very rapidly.  The share of renewable in electricity generation is around 18%, with 15% of global electricity coming from hydroelectricity and 3% from renewable.

Hydropower is one of the most efficient renewable energy sources.  It is particularly suited to small scale application typically being far cheaper per unit (kwh) of electricity produced than wind power or solar power.  It can be used to do electrical or mechanical work.

Pico hydro is water power up to 5kw.  There are thousands of sites where people have a source of falling water but do not have electricity.  For these rural communities, pico hydro is the lowest cost technology for generating electricity  Lighting from this source is cheaper than using kerosene lamps, and safer, too.

3.2    Run of the river hydro electricity

Run of the river hydro electric system used water flowing in a river to generate power.  They don’t store any significant amount of water.  It usually involves a low level diversion weir or a stream bed intake is usually located on a fast flowing, non seasonal stream or river.

A low level diversion weir raises the level of the river water just enough so that a structure for intake can be suited on, or next to the river.  The intake has a debris screen and a submerged opening with an intake gate.  While a stream bed intake require no wire.  The water drops thru a screen inlet duct which a flush the bottom of the riverbed. It is necessary to flush out debris, as rocks and gravel will enter a stream bed intake.

With either set up, the water is carried downhill thru a pipe (called a penstock) to a power station downstream of the intake.  The power plant is located at as low a level as possible to gain maximum head on the turbine.  The water leaves the power plant and is returned to the river without altering the existing flow or water levels.  Most run of river power plant will have a dam across the full width of the river to utilized the entire river’s water for electricity generation such installation will have a very small reservoir behind the dam as there is minimal flooding, they can be considered “run of river”.  From an environmental perspective, a general recommendation is that no more than 20-50 percent of creeks flow should be diverted for a run of the river hydro system

Advantages:

  • Damming and flooding the river is not required as run of the river hydro system don’t need a reservoir.
  • People and animals living near the river don’t need to be relocated and natural habitats are preserved, reducing the environmental impact.
  • Great for small hydro set ups

Disadvantages:

  • The output of the power plant is highly dependent on natural run off.  Spring melts can create a lot of energy.
  • Conversely, dry seasoned or drought will result energy output.  This disadvantage can be reduced if a site with consistent flow is chosen.
  • Commercial sites are limited or extremely remote resulting in reduced commercial viability.

3.3    Penstock

Penstock is open or closed conduits carry water to the turbines.  They are generally made of reinforce concrete or steel.  Concrete penstock is suitable for low head as greater pressure causes rapid deterioration of concrete.  The steel penstock can be design for any head, the thickness of the penstock increases with the head or working pressure.

Penstock for hydroelectric installation is normally equipped with a gate system and a surge tank. Flow is regulated by turbine operation and is nil when turbines are not in service.  Maintenance requirements may include how water wash, manual cleaning, antifouling coating, and desiccation.

3.4    Water turbine

A water turbine (also called hydraulic turbine or hydro turbine) converts the kinetic energy of water into mechanical energy.  This mechanical energy can be converted to electrical energy and used for various commercial, industrial and commercial applications.  Micro-turbines are used to produce electricity on a small scale.  They commonly serve villages and small communities  Water turbines are used to irrigate lands and crops.

According to “Simplified Irrigation Design,”  there are two types of water turbines used for irrigation:  horizontal centrifugal pump and vertical turbine pump.  Irrigation lands use these water turbines for the control and supply of water.  Horizontal centrifugal pumps impel water from lakes, shallow wells and other water reservoirs.  Vertical turbine pumps are used for pipeline plumbing, drainage plumbing, plant and municipal water supply, petrochemical applications, high-pressure pumping and flood control.  A vertical turbine pump is commonly used whenever a liquid has to be pumped out from an underground water table, underground storage systems or open bodies of water (lakes, rivers, ponds, oceans,  and tanks).  Electric generator is a device that converts mechanical energy such as that provided by the combustion of fuel or by wind or water, into electrical energy.  It generally undergoes electromagnetic induction which works by forcibly moving a loop of wire around a stationary bar that provides an electric field, either through a permanent magnet or an electromagnet.  Motors are usually the source of mechanical energy usually for an electric generator.  But it may also come from a reciprocating or turbine steam engine, water falling through a turbine or waterwheel, an internal combustion engine, a wind turbine, a hand crank compressed air or any other source of mechanical energy.

3.5    Theory of operations

Flowing water is directed on the blades of a turbine runner, creating a force on the blades since the runner is spinning, the force acts thru a distance.  In this way, energy transferred from the water to the turbine.

Water turbine are divided into two groups; reaction turbine and impulse turbines, the precise shape of water turbine blades is a function of the supply pressure of water, and the type of impeller selected.

3.6    Reaction turbine

Reaction turbines are acted on by water, which changes pressure as it moves thru the turbine and give up its energy. They must be encased to contain the water pressure or they must be fully submerged in the water flow.

3.7    Impulse turbine

Impulse turbines change the velocity of a water jet.  The jet pushes on the turbines curved blasé which changes the direction of the flow.  The resulting change in momentum causes a force on the turbine blades since the turbines spinning the force thru a distance and the diverted water flow is left with diminished energy.

The turbine type is selected based on the speed range and power capacity of alternator to be used.  It can be noticed in the figure that pelton turbine is a quite universal turbine.  It is not always restricted to high head, but of the power transmitted is low, then the pelton will also run on low heads, although at slow rotational speed.  In this pico hydro system, Kaplan type of reaction turbine is used to generate electricity.

3.8    Generator

A generator is a machine that converts mechanical energy into electrical energy.  Generators can be subdivided into two major categories depending the electric current produced is alternating current or direct current.  The principle on which on both types of generator works is the same, the details constructed of the two may differ somewhat.

3.9    Principle of operations

In1820, Danish physicist hans Christian oersted (1777-1851) discovered that an electric current created a magnetic field around it.

French physicist andre’ marie ampere (1775-1836) then found that a coil of wire with current running thru it behaved just like a magnet.

In about 1831, English physicist Michael Faraday (1791-1867) discover the scientific principle on which generators operate: electromagnetic induction.  By reversing the work of oersted and extending the work of ampere, faraday reasoned that it a current running thru a coiled wire could produced a magnetic field, then a magnetic field could induced a current of electricity in a coil of wire.  By moving magnet back and forth in or near a coil of wire, he created an electrical current without any other soure of voltage feeding the wire.

3.10      Theory of operations

Flowing water is directed on to the blades of a turbine runner, creating a force on the blades.  Since the runner is spinning, the force acts thru a distance.  In this way, energy is transferred from the water flow to the turbine.

3.11      Alternating current generator

A magnet creates magnetic lines of force on either sides of it that move in opposite directions.  As the metal coil passes thru the magnetic field in the generator, the electrical power that is produced constantly changes.  At first, the generated electric current move in one direction (as from left to right).  Then, when the coil reaches position where it is parallel to the magnetic line of force, no current at all is produced.  As the coil continues to rotate, it cuts thru magnetic lines of force in the opposite direction, and the electrical current generated travels in the opposite direction.  The ends of the coil are attached to the metal slip rings that collect the electrical current. Each slip ring in turn is attached to a metal brush, which transfer the current to an external circuit.

Thus, a spinning coil, in a fixed magnetic field will produced an alternating current, one that travel first in one direction and then in the opposite.  The rate at which the current switches back and forth is as its frequency.  Ordinary household current alternate at a frequency of 60 times per seconds or 60 hertz.

The efficiency of an AC generator can be increased by substituting an armature for the wire coil.  An armature consists of a cylinder shaped iron core with a long piece of wire wrapped around it.  The longer piece of wire the greater the electrical current that an be generated by the armature.

3.12      Commercial generators

One of the most important uses of generator is the production of large amount electrical energy for use industry and homes, the two most common energy sources used in operating AC generators are water and steam.  Both of these energy sources have the ability to drive generator at the very high speed at which they operate most efficiently, usually no less than 1500 revolution per minutes.

In order to generate hydroelectric power, a turbine is needed.  A turbine consists of a large central shaft on which are mounted a series of fanlike vanes.  As moving water strikes the vane, it causes the magnet to rotate around a central armature, generating electricity.

3.13      Electronic controller

An electronic controller is connected to the generator.  This matches the electrical power that is produced to the electrical load that are connected, and stop the voltage from changing as device are switched on and off.

3.14      Distribution system

Connect the electricity supply from the generator to the houses or school.  This is often one of the most expensive parts of the system.

3.15     Electrical load

Usually, connected inside houses.  This is a general name given to any device that uses the electricity generated.  The type of load connected to a pico hydro scheme depends largely on the amount of power generated.  Proper used of power connected to the same generator.

3.16      Calculation of hydro power
The two vital factors to consider are the flow and the head of the stream or river,  The flow is the volume of water which can be captured and redirected to turn the turbine generator, and the head is the distance the water will fall on its way to the generator.  The larger the flow example the more water there is, and the higher the head to electricity.  Double the flow and double the power double the head and double the power again.

A low head site has a head of below 10 meters.  In this case you need to have a good volume of water flow if you are to generate much electricity.  A high site has a head of above 20 meters.  In this case you ca get away with not having a large flow of water; because gravity will give what you have an energy boost.

The key equation to remember is the following:

Power = Head x Flow x Gravity

Where power is measured in Watts, head in metres, flow in litres per second, and acceleration due to gravity in metres per second.

The acceleration due to gravity is approximately 9.81 metres per second – i.e. each second on object is falling, its speed increases by 9.81 metres per second (until it hits its terminal velocity)

Therefore it is very simple to calculate how much hydro power you can generate.  Let’s say for example that you have a flow of 20 litres per second with a head of 12 metres.  Put those figures in the equation and you will see that:

12 x 20 x 9.81 = 2,354 Watts

3.17      Real world hydro power calculation

In the calculation of hydro power , it is not possible to tap all of its power – nothing is 100% efficient.  However, hydro power turbine generator is very efficient when compared to wind turbine generator and solar panel.  Efficiencies of around 70% can be expected which is to say that 70% of the hydraulic energy of the flowing water can be turned into mechanical energy spinning the turbine generator.  The remaining 30% is lost.  Energy is again lost in converting the mechanical energy into electrical energy ad so at the end of the day you can expect a complete system efficiency of around 50-60%.

3.18      Variable on load power station

The function of power station is to deliver power to a large number of consumers.  However, the power demands of different consumer vary in accordance with their activities  The result of this variation in demand is that load on the power station is never constant.; rather it varies from time to time.  Most the complexities of modern power plant operation arise from the inherent variability of the load demand by the users.  Unfortunately, electrical power cannot be stored and therefore the power station must produce power as and when demanded to meet the requirement of the consumer.  A load given can be represented as a curve showing the variation of load on the power station with reference to time.

Pico hydro is hydro power with a maximum electrical output of five kilowatts.  Hydro power systems of this size benefit in terms of cost and simplicity from different approaches in the design, planning and installation than those which are applied to larger hydro power.  Recent innovations in pico hydro technology have made it an economic source of power even in some of the worlds poorest and most inaccessible places.  It is also a versatile power source. AC electricity can be produced enabling standard electrical appliances to be used and the electricity can be distributed to a whole village.  Common examples of devices which can be powered by pico hydro are light bulbs, radio’s, televisions, refrigerators and food processors.  Mechanical power can be utilized with some designs  This is useful for direct drive of machinery such as workshop tools, grains mills and other agro-processing equipment.

Om a global scale, a very substantial market exists in developing countries for pico hydro systems (up to 5kW).  There are several reasons for the existence of this market.

  • Often, small communities are without electricity even in countries with extensive grid electrification.  Despite the high demand for electrification, grid connection of small communities remains unattractive to utilities due to the relatively low power consumption
  • Only small water flows are required for pico hydro so there are numerous suitable sites.  A small stream or spring often provides enough water.
  • Pico hydro equipment is small and compact.  The component parts can be easily transported into remote and inaccessible regions.
  • Local manufacture is possible.  The design principles and fabrication processes can be easily learned.  This keeps some equipment costs in proportion with local wages.
  •  The number of houses connected to each scheme is small, typically under 100 households.  It is therefore easier to raise the required capital and to manage maintenance and revenue collection.
  • Carefully designed pico hydro schemes have a lower cost per kilowatt than solar or wind power.  Diesel generator systems, although initially cheaper, have a higher cost per kilowatt over their lifetime because of the associated fuel costs.

Excerpt from the Project Study for Rural Electrification by Jerome dela Cruz, Kenneth Aquino, Wilgem Regino Crespo, John Andrew Molino and Rosauro Fernando Jr of BPSU.

Related Literature for Pico Hydro for Rural Electrification

2.0 Related Literature

The related literature and studies help the researcher understand his topic better because it may clarify vague points about his problem. It also guides the researcher in making comparison between his findings with the findings of other similar studies.  This chapter provides a brief discussion of the Pico hydro technology available in other countries considering its impact to the society.  In relationship, our projects also cover the potential of using the Pico hydro electric generator as a source of renewable energy with consideration to the environment.

2.1 Community Pico Hydro in Sub-Saharan Africa

Site: Kathamba, Kirinyaga District, Kenya

2.1.1    Background

This scheme was installed as part of a program implemented by The Micro Hydro Centre at Nottingham Trent University to demonstrate  Pico Hydro technology in Sub Saharan Africa.  The cost of the penstock, turbine and generator equipment was met by the project funders (European Commission) and all other costs were contributed by the 65 households which the scheme now supplies with electricity.

2.1.2    Technical Summary

This case study describes a pico hydro plant using a Pelton turbine directly-coupled to an induction generator which has an electrical output of 1.1kW.  The penstock is 158m in length, 110 mm diameter PVC pipe.  The net head is 28m and the flow into the turbine is 8.4 l/s.  The electrical output of 1.1kW corresponds to a turbine generator efficiency of 48%.  The water source is a small spring with a flow rate of at least 51/s during 90% of the year ad has never been known to run completely dry.  Approximately 80m3 of storage has been provided at the intake to ensure that the turbine can be kept running for long periods.  The generator output is regulated by means of an Induction Generator Controller to ensure that the voltage and frequency are held at the correct values during conditions of changing consumer load.  Excess power is fed to a ballast load.  A 2kW cooking ring was used for this.  There are 65 households within a 550m radius of the turbine house and these are all being connected to the generator using a single-phase distribution system and insulated copper conductors.  It is possible to do this cost-effectively since the current drawn by each house is small and restricted by a current limiter so the distribution cables are also small in diameter.  Each house has a 230V supply which is sufficient for one or two energy-saving lamps and a radio.  The locations of the generator and consumer houses were recorded using a GPS system so that a distribution plan could be developed  The average cost per house for all equipment and materials was around $58 and more than 50% of this cost was contributed by the consumers.

2.1.3    General Description of the Site

Kerugoya town lies 130 km north of Nairobi on the southern foothills of Mount Kenya (Kirinyaga in Kiswahili).  Kathamba is located on the eastern side of the Mukengeria River near to Gaghihi approximately 4km north of Kerugoya  Travelling time from the town is approximately 20 minutes along unmade roads  The spring, which provides the hydraulic power for the pico hydro system, flows into the Mukengeria River approximately 300m from the source  There are 65 houses within 550m of the junction between the stream and the river and two sites for new houses.  The principle source of income in this region is through farming and the crops grown include tea, coffee, maize and fruits.

2.1.4    Community Participation

One of the principle elements which lead to the successful implementation of this project was community participation.  This was necessary both to lower the installation cost and to foster a sense of local ownership. Once it was established that there was sufficient hydro potential at this site, the first community meeting was held to discuss the project concept.  A Community Electricity Association was formed and a committee elected to manage the installation of the project and oversee the operation of the scheme.  A written agreement was subsequently signed between the community and the implementing partners.

It was agreed that all labour for the project was to be provided by the community in addition to the building materials required for the intake and the turbine house.  The consumers also were required to pay a connection fee once the turbine was commissioned.  This covered the costs of the distribution cables, housewiring and energy saving lighting bulbs.  The community association was also required to register with the local government office and to open a bank account in order to save the local contributions towards the project costs.

2.1.5    Intake and Storage Pond

The design flow for this scheme was just over 8 litres per second.  This flow will normally be available throughout most of the year although during the driest periods when it can fall to 3 l/s/  A small concrete weir was designed which would provide sufficient depth of water to ensure that the penstock is fully submerged at all times.  The natural storage area behind this weir was also enlarged by widening of the banks to 4-5 meters width and 20m length.  This provides sufficient storage to supply the extra flow required for 4 hours of evening lighting during the driest part of the year when the shortfall is at a maximum of 5.5 l/s/ 5.5  60  60 x 4 hours = 79,200 litres storage capacity required (79.2 m3).

Storage provided = 4m wide x 20m length x 1 m depth = 80m3

2.1.6    Penstock

The penstock pipe conveys water from the intake to the turbine and provides the pressure required at the nozzle.  The length required was 158 metres.  This was the shortest measured distance between the intake and the turbine.  PVC pipe with a diameter of 110mm was selected.  This gave 2m head loss with a flow of 8 l/s and provided a net head of 28m. Class B PVC (6 bar pressure rating) although a lower pressure rating could have been used if available.  The increased wall thickness however improved the reliability and lifetime of the penstock.  A trench was dug from the intake to the turbine house so that the pipe could be buried to anchor it in place and to protect it from damage by the sun.

2.1.7    Turbine house

The location for the turbine house was chosen to give the maximum available head whilst still being high enough away from the river at the bottom of the valley to avoid flooding during the rains.  The building was constructed using local stone and timber to minimize material and transportation costs.  The farmer who owned the land where powerhouse was constructed was given a free light as a concession by the local community in return for the land which was used.

2.1.8    Turbine

A Peltron turbine runner was used to convert the hydraulic power into rotating mechanical power.  This was connected directly to an induction generator and housed inside a metal casing.  The Peltron runner is defined in terms of its p.c.d. (pitch circle diameter).  Runner p.c.d.’s of 120 m, 160 mm and 200 mm were available.  Different sizes of runner operate best with different combinations of head and flow.  The runner had to rotate at the correct speed to drive the induction generator.  The speed range of these is limited because electricity at 50Hz is required for the electrical loads connected in the system.  For this site, a 6 pole generator coupled to a 200mm p.c.d. runner is suitable.  This is shown by the following equations:

The operating speed of a six pole induction generator is given by the following:

Rpm = (120 x frequency) /6 x (1 + %generator slip)

2.1.9    Local Manufacture

Turbine components were fabricated by Kenyan Electrical Distributors who received training during a 2 week course for African manufacturers of pico hydro equipment held by the Micro Hydro Centre near Nairobi in February 2001.  Another Kenyan firm, Rodson Electronics, who also participated in the training, fabricated the load controller, the enclosure and made the internal connections to the capacitors and protection equipment.

2.1.10    Generator

An IP55 1.5kW phase induction motor with 240V delta connection was selected for use as the generator.  As shown above, the required number of poles was 6.  In addition, the IP rating for the selected motor was IP55 to ensure maximum protection from entry of water and dust inside the machine.

The connection of capacitors to the motor is required in order for it to operate as a generator.  By connecting the capacitors in a C-2C arrangement it is possible to produce single-phase power efficiently from a 3-phase induction motor.

2.1.11    Operator Training

Sufficient training for key individuals was essential to ensure that the scheme will continue to be operated and maintained successfully in the future  Local electricians were involved from the beginning of the turbine and generator installation.  They were given on the job training to ensure that they could locate faults and replaced damaged components.  This was particularly important as these are the first scheme of their kind in Kenya.  The training was back up with comprehensive documentation including complete circuit diagrams and a maintenance schedule.  The new internet facility in Kerugoya town (1 hr walk from the site) provides a route to a further source of technical back-up; the operators are now able to request advice directly from pico hydro specialists in Nairobi or the UK if a problem arises which cannot be solved locally.  The consumers are charged a fixed monthly tariff depending on whether they have two lamps or one.  This is used to pay the operators wages and to contribute to a maintenance fund to replace worn components and keep the scheme operating.

2.1.12    The Distribution System

The plan below shows the position of the consumers relative to the generator.  The large circle represents a radius of 500m from the turbine house.  The location of the houses was recorded using a widely available and relatively low-cost hand-help GPS system.  This allowed the length of cable required to reach all the houses to be accurately calculated and then sized to ensure that even consumers at the furthest points in the system received a supply which was within an acceptable voltage range without excessive cost.  This was important as the entire cost of the distribution system and house wiring was met by the electricity consumers.  Local trees were used for distribution poles after basic treatment to reduce damage by termites and weathering.  The installation of the distribution system initially required a considerable degree of co-ordination to collect, treat and erect a sufficient number of poles.  Guidance was given on the required pole height, methods of treatment, and buried depth and the spacing.  Every consumer contributed one or two poles to the scheme.

The first few houses were connected under supervision from the project implementers, particularly with regard to pole positioning; cable tensioning and service were connection.  The final phase of the project, to connect the remaining houses, continued under the direction of the local electricians and committee members without the need for much external support.

The immediate prospect of electric lighting and connection of small electrical loads such as radios and, in some cases, mobile phone chargers, rapidly encouraged the payment of the remaining connection fees.  This allowed the final cables and house wiring components to be purchased.  In addition, the electricians were paid on a per consumer basis for the house wiring and therefore were keen to keep up the pace of installation of the final poles and conductors. on the right

2.1.13    Project Costs

The hydro potential at this site was limited by the small flow.  Due to the limited power available and the relatively large number of consumers living nearby, the power per house is sufficient only for one to two lamps and a radio.  This however, had the advantage that the cost of the distribution was divided amongst more people ad so households at all income levels were able to benefit.  Consumers paid for a 1 lamp or 2 lamps connection depending on how much they were able to afford.

The total cost was $58 per house.  This is particularly reasonable when compared to a lead acid battery which, when bought new, not only costs more but requires regular charging, provides DC power only and has a useful life of 2 years or less. A solar home system, providing a similar amount of power as the pico hydro has the same disadvantages as a battery only system ad would have cost at least 5 times more per house.

Excerpt from the Project Study for Rural Electrification by Jerome dela Cruz, Kenneth Aquino, Wilgem Regino Crespo, John Andrew Molino and Rosauro Fernando Jr of BPSU.

Acknowledgment Sample

Acknowledgment                  

We would like to express our deepest appreciation to those people who helped even in the smallest way in making the completion of this book entitled “Pico Hydro for Rural Electrification” possible.

To our instructor Engr. Nelson S. Andres, who never failed to guide us and give important advise regarding our thesis and for any problems that was encountered regarding the completion of this book.

To our parents, for the financial support and encouragement.

To our fellow classmates, for suggestions and sharing of valuable information.

And most of all to our Almighty God, for giving us everything.  Praise be to You oh Lord God.

Thank you very much!

Jerome dela Cruz
Kenneth Aquino
Wilgem Regino Crespo
John Andrew Molino
Rosauro J. Fernando Jr.